Real Time Water Quality Information - Calibration Schedule and Deployment Reports
Calibration Schedule
The water quality probe is periodically removed to undergo necessary maintenance and calibration. Some of these removals are necessary to perform scheduled maintenance while others may be done in response to sudden fouling of the sensors or loss of calibration.
The maintenance/calibration process involves removing the water quality probe from the water body for cleaning, replacement of sensor fluids and membranes where necessary, and calibrating and testing in a temperature-controlled laboratory. This usually takes place over a period of two days but may take longer for specific sites or to address unique problems.
^ Top of Page
Deployment Reports
After each deployment a brief report describing water quality events and conditions at each site is prepared by the Environmental Scientists. The reports are grouped by station and can be viewed as Adobe PDF files at the links below.
^ Top of Page
Water Quality Monitoring Agreement
Note: all links below are PDFs and will open in a new window.
NF02YL0012 - Humber River at Humber Village Bridge
NF02ZM0178 - Leary Brook at Prince Philip Drive
NF02YO0121 - Peter's River near Botwood
NF02ZM0009 - Waterford River at Kilbride
NF02ZE0033 - Southwest Brook below Southwest Pond ((Miawapukek First Nation Pilot Project)
2009
2010
2011
2012
NF03QA0047 Lake Melville East of Little River & NF03OE0054 Churchill River at English Point
- Calibration Schedule
- 2011
- 2012
^ Top of Page
NF02YG0022 - Main River At Paradise Pool
NF03OE0030 - Minipi River Below Minipi Lake
^ Top of Page
Vale Inco Newfoundland and Labrador Limited
Vosiey's Bay Stations
Voisey's Bay (NF03NE0003 - Reid Brook at Outlet of Reid Pond, NF03NE0010 - Camp Pond Brook below Camp Pond, NF03NE0011 - Lower Reid Brook below Tributary, NF03NE0012 - Tributary to Reid Brook, NF03NE0008 - Voisey's Bay - Well After Tailings Dam)
Long Harbour Stations
02ZK007 – Rattling Brook Big Pond,
NF02ZK0023 - Rattling Brook below Bridge,
NF02ZK0025 – Rattling Brook below Plant Discharge
Nalcor Energy
NF03OE0050 - Churchill River 6.15km below Lower Muskrat Falls, 03OE001 - Churchill River Above Upper Muskrat Falls, NF03OE0051 - Churchill River Below Grizzle Rapids, NF03OD0013 - Churchill River Below Metchin River
^ Top of Page
Duck Pond Operations (Teck Resources Ltd.)
Duck Pond Operations (NF02YO0190 - Tributary to Gill's Brook, NF02YO0192 - East Pond Brook, NF02YO0193 - Well After Tailings Dam)
^ Top of Page
Newfoundland and Labrador Refining Corporation
02ZH002 - Come By Chance River Near Goobies
^ Top of Page
Tata Steel Minerals Canada Ltd
- NF03OB0039 Elross Creek below Pinette Lake Inflow & NF03OB0040 Goodream Creek 2km Northwest of Timmis 6
- Calibration Schedule
- 2011
- 2012
Labrador Iron Mines
- NF03OB0038 James Creek above Bridge & NF03OB0037 Unnamed Tributary below Setting Pond
- Calibration Schedule
- 2010
- September to October 2010 (1.2 MB)
- 2011
- 2012
^ Top of Page
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free. 